That's why they went with the blended system with Caltrain. Caltrain already owns a suitable right-of-way; they just needed to electrify it. Which they've already done. The SF-to-SJ part of CAHSR is effectively done; they just need to built acquire the SJ-to-Gilroy right of way and tunnel under the Pacheco Pass to connect with the rest of CAHSR.