This was false. The plant was shut down for an extra two weeks to control Sonic supply. There's been more demand than inventory almost everywhere except California. They've basically sold everything they've made. LG Chem was contracted for 30k batteries and that's about what they will have sold by Jan or Feb or so at the current rate.